Production Credits
Genesis TURN IT ON AGAIN tour 2007 Stadium tour production consultant: Wob Roberts Mark Fisher writes: To meet the logistical challenge, the design was based around four complete systems of rented StageCo components that ‘leapfrogged’ between venues. The production equipment (lighting instruments, LED screens, PA and band gear) typically arrived at the stadium on the day of show, 10 hours before the audience were admitted. To make the load-in flow quickly, almost all work was undertaken at stage level. The design ensured that the various production departments occupied the stage without overlapping each other. This meant that each department could lift its equipment into the air without waiting on other departments to clear space. The lighting equipment on the curved finger trusses was loaded at stage level and pulled up dedicated tracks. The 250ft wide curved LED screen - a custom fabrication of Barco O-Lite tiles arranged in varying densities across pressed aluminium battens – was designed to be erected in under three hours. It hung from a curved fascia truss that itself contained an array of intelligent lights. The truss contained all the rigging for the screen. It was lifted up from pre-built towers; once in position the carts of LED panels were parked below and the screen lifted into place. |